Integrated Health Project, Benton

Client

Intergrated Health Project

Location

Benton

Specification of Work

Roof Refurbishment and Maintenance

Project Length

8 Weeks

The Project

The warehouse building is situated in Benton Square Industrial Estate in Benton Newcastle upon Tyne. The Warehouse is to be used for storage for medical goods.

COMPOSITE ROOF CLADDING

Integrated Health Projects Benton Warehouse Roof works

  • 1,700m2 Re-roofing using conventional composite roof panels
  • 8 week contract duration

Before / After

Integrated Health Project, Benton
Before
Integrated Health Project, Benton
After

Client Problem

value in comparison with today’s standards and a large amount of heat was being lost through the pitched roof. Thus a combination of a roof that leaked in any inclement weather and one that resulted in excessive heating costs for the company through poor insulation.

Our Solution

Asbestos cement profiled roof cladding was removed by a specialist contractor from below the roof level. Roofclad provided a new Kingspan profiled roof system, 115mm composite complete with new insulated gutters, external trimline type gutters, rainwater pipes and a permanent handrail system.

The client has now a Kingspan Ultimate Panel Guarantee covering the structural and thermal performance for a period of up to 25 years and coating performance for a period of up to 30 years.